Gravel

Footprint times depth becomes yards — and the tonnage the quarry truck actually charges you for.

The area
turnaround, odd corner
On the counter

Your buy list

0

tons to order · or 0 yd³ by the yard
Area covered
—
Volume in place
—
With allowance
—
Exact weight
—
Truck loads
—
Estimated cost
—

Rounded up to what the quarry sells. Density varies by quarry — theirs wins.


Why gravel sells by weight

You dig by volume but buy by weight, because a loader bucket's worth of wet crushed stone and dry pea gravel fill the same space and weigh different amounts. The bridge between them is density — around 1.4 tons per cubic yard for common crushed products — which turns your carefully measured depth into the number on the invoice. Pick the material and the density field takes a typical figure for it; the field stays editable because the quarry's own number is better than any table.

Depth choice carries more risk than any other number here: two inches looks great the day it spreads and disappears into mud by spring. Four inches minimum wherever wheels roll.

Allowance first, then rounding

A 40 × 12 ft driveway 4 inches deep is 5.93 cubic yards once it is down and compacted. It does not arrive that way: base stone loses height under the compactor and some of every load ends up in the lawn, so the calculator adds 10% (6.52 yards, 9.13 tons at 1.4) and only then rounds up to what a quarry will load — 9.5 tons. Rounding is always up; an order rounded down is a driveway with a thin end.

What sits on top of it

Gravel under a slab is a base course, and the slab is a separate order: the same footprint and a thickness go into the concrete calculator for bags or cubic yards. Compact the gravel before the pour, or the slab settles into the voids you left it.

The truck-load line

A standard single-axle dump delivers about 10 tons; a small trailer tows 2. The estimate above divides your tonnage so you know whether this is one phone call or three weekend hauls.


On the counter

The assumptions and limits this calculator uses. The form exposes the settings you can change; fixed allowances are described below.

Density
Tons per cubic yard, typical published figures: crushed stone 1.4, pea gravel 1.35, crusher run / road base 1.5, river rock 1.35, sand 1.35, decomposed granite 1.5. They vary by quarry, stone and moisture — overwrite the field with your supplier's number
Allowance
10 % by default for compaction and spillage, added before rounding; adjustable, and 0 gives the bare in-place volume
Depth
Set per project: 2" paths, 4" driveways, 6" soft ground, or choose Custom and type your own
Rounding
Tons and yards both round up to the next half, or to the next whole one if that is how your supplier sells
Truck loads
About 10 tons per single-axle dump truck; 2 tons or less is treated as one trailer trip
Cost
Order quantity × the price you enter, before tax and delivery

Questions from the aisle

How much does a cubic yard of gravel weigh?

Roughly 1.4 tons for typical crushed stone — the default here. The material selector sets a typical figure for each product: 1.35 for pea gravel, river rock and sand, 1.5 for crusher run and decomposed granite. Those vary by quarry and by how wet the pile is, so type your supplier's number into the density field if they give one.

How deep should a gravel driveway be?

4 inches over stable soil, 6+ inches over soft ground. Driveways also want 3–4 inch stone as a base course with finer gravel on top — calculate each layer separately.

How much gravel for a 40 × 12 ft driveway?

At 4 inches deep that is 5.93 cubic yards in place. With the 10% compaction and waste allowance it is 6.52 yards, 9.13 tons of crushed stone at 1.4 tons per yard — a 9.5 ton order where the quarry sells by the half ton, or 7 yards where it sells by the half yard.

Bags or bulk?

Bulk, almost always. A cubic yard is 54 of the 0.5 cu ft bags stores sell, and at about 1.4 tons it is more than a half-ton pickup should carry in one trip.

Does gravel compact or settle?

Yes. Crushed stone with fines packs down under a plate compactor, so it takes more loose material than the finished depth suggests; rounded pea gravel and river rock barely compact but scatter. The calculator adds 10% before it rounds — raise it on soft subgrade, drop it toward 5% for round stone in an edged bed.



Next off the wall

The rest of yard & ground — most jobs need two or three of these before the first trip to the store.

All landscaping calculators Every calculator on the board

The reasoning behind this one

Mulch and gravel by the cubic yard

Where the assumptions above come from, what changes them, and the mistakes that cost a second trip. Free to read, no account needed.