Concrete

Slab, footing or post holes — the volume, and the bag count that actually fills it.

The pour
step pad, odd corner
Under and in the slab
On the counter

Your buy list

0

80 lb bags · or 0 yd³ ready-mix
Volume
—
Cubic yards
—
Ready-mix order
—
Weight mixed
—
Water needed
—
Gravel base
—
Reinforcement
—
Estimated cost
—

Waste included — subgrade is never flat.


Bags or a truck

Concrete is sold two ways and the crossover is about one cubic yard. Under that, bags win: you mix what you need, when you need it, and an unopened bag goes back to the store. Over it, bags stop being a saving and start being a problem — 45 of them is a full day of mixing, and concrete placed over concrete that has already stiffened makes a cold joint that will crack along its line.

The volume itself is simple: length times width times thickness, all in the same units, then divided by 27 to get cubic yards. What people get wrong is the thickness — a "4 inch" slab poured over ground that dips an inch is a 5 inch slab in places, which is where the 10 % waste allowance goes. A plant batches in quarter yards, so the ready-mix line is already rounded up to the next quarter: 1.36 yards is a 1.5 yard order, never 1.25. Below the plant's minimum load you pay a short-load fee on top — the minimum and the fee are theirs to quote, so ask the plant before you compare the truck against bags.

What a slab needs underneath

PourThicknessBaseReinforcement
Walkway4 in4 in compacted gravelFibre mesh or none
Patio4 in4 in compacted gravelWire mesh
Driveway5–6 in6 in compacted gravel#3 rebar at 18 in
Garage floor5 in4–6 in gravel + vapour barrierWire mesh or rebar
Shed pad4 in4 in compacted gravelWire mesh

The buy list carries both. The gravel base line takes the slab's footprint and the base depth, adds 10 % for compaction and rounds up to the half yard — 1.5 cubic yards, about 2 tons, under a 10 × 10 ft slab at 4 inches. For a different stone or density, the gravel calculator takes the same footprint and gives the tonnage the quarry will invoice.

Reinforcement is counted two ways. Wire mesh is sheets: a 5 × 10 ft sheet lapped 6 inches over its neighbours nets 42.75 square feet, so that slab takes 3. Rebar is a grid: a bar every 18 inches each way plus one to close the edge is 7 bars in each direction, 140 feet, 154 with laps — 8 twenty-foot sticks.

Post holes

Switch the shape above to round and the form counts holes instead of slabs. A 10 inch hole 3 feet deep holds about 1.6 cubic feet of concrete, 1.8 with waste — three 80 pound bags — and six of them take 18. That is the figure for a footing or a sonotube, which is solid concrete. A fence or deck post takes up part of its hole: tell the form what is standing in it and a 4x4 brings those six holes down to 16 bags. Dig below the frost line where you have one; a post set above it will heave itself loose within a few winters.


On the counter

The assumptions and limits this calculator uses. The form exposes the settings you can change; fixed allowances are described below.

Bag yield
80 lb = 0.6 cu ft mixed, 60 lb = 0.45, 50 lb = 0.375, 40 lb = 0.30
Waste
10 % by default — subgrade is never as flat as the plan
Ready-mix
Suggested past one cubic yard and rounded up to the next quarter yard (or the step you choose). Plants set their own minimum load and short-load fee — ask the plant
Post in the hole
Subtracted at dressed size over the full hole depth: a 4x4 is 3.5 in square, a 6x6 is 5.5 in; round posts by outside diameter. None for sonotubes and footings
Gravel base
Slab footprint × base depth, plus 10 % for compaction, rounded up to the next half yard; tons at 1.4 per yard, rounded up to the half ton. Set the depth to 0 to leave it off
Wire mesh
5 × 10 ft sheets lapped 6 in, so each nets 42.75 sq ft. Stores also sell other sheet sizes and rolls — check before you buy
Rebar
A grid both ways at the chosen spacing plus one bar to close each edge, 10 % added for laps, in 20 ft sticks. A slab entered as square feet, or with an added area, is laid out as a square of the same area
Cost
Quantity to buy × the price you enter, before tax, delivery and any short-load fee. Base and reinforcement are not priced
Not included
Forms, vapour barrier, rebar chairs and tie wire — those are separate buys

Questions from the aisle

How many bags of concrete for a 10x10 slab?

At 4 inches thick that is 33.3 cubic feet, or 36.7 with 10% for uneven subgrade — 62 eighty-pound bags, or 1.36 cubic yards, which is a 1.5 yard ready-mix order. That is well past the point where a truck is easier: a yard and a third of concrete is not a wheelbarrow job.

How many 80 lb bags in a cubic yard?

Forty-five. An 80 pound bag yields about 0.6 cubic feet mixed, and a cubic yard is 27 cubic feet. Sixty-pound bags yield 0.45, so it takes 60 of those.

When should I order ready-mix instead?

Around a cubic yard — roughly 45 bags. Past that you are mixing for hours while the first pour sets, which is how cold joints happen. Plants sell in quarter-yard steps, so the calculator rounds the order up to the next quarter. Most also set a minimum load and charge a short-load fee below it; the figure differs plant to plant, so ask when you call.

How deep should a post hole be?

A third of the post length or below the frost line, whichever is deeper, and three times the post width across. A 4x4 usually gets a 10 or 12 inch hole; switch the form above to round post holes and it will count the bags per hole.

Do I subtract the post from a post hole?

Yes, if a post stands in it. A 4x4 fills 16% of a 10 inch hole, so six holes 3 feet deep drop from 18 eighty-pound bags to 16 once the posts are counted. Choose the post under "Post in the hole"; leave it on None for sonotubes and footings, which are solid concrete.

What else goes on the list for a slab?

A compacted gravel base and, for most slabs, reinforcement. For the 10 × 10 ft slab the list adds 1.5 cubic yards of gravel for a 4 inch base (about 2 tons) and, if you pick them, 3 sheets of 5 × 10 ft wire mesh or 8 twenty-foot sticks of #3 rebar on an 18 inch grid.



Next off the wall

The rest of outdoor structures — most jobs need two or three of these before the first trip to the store.

All outdoor structure calculators Every calculator on the board

The reasoning behind this one

Concrete: bags or a ready-mix truck

Where the assumptions above come from, what changes them, and the mistakes that cost a second trip. Free to read, no account needed.